Batteries
Can you add a battery to an existing solar system?
Most Perth solar systems can take a battery. Whether your inverter stays, and what changes with Western Power and your buyback, is what decides the job.
Yes, you can add a battery to most existing solar systems in Perth, and there are two ways to do it. An AC coupled battery comes with its own inverter and connects alongside your existing solar inverter, which stays. A DC coupled battery shares a hybrid inverter with the panels, which usually means replacing the inverter you have. Which one suits you depends mostly on the age and type of that inverter.
Adding a battery also counts as an upgrade under Western Power's rules from 1 May 2026, so the system has to meet the current export requirements. And if you are on the old REBS buyback, the change can end it. Both are worth knowing before you collect quotes.
AC or DC coupled
An AC coupled battery keeps your solar inverter and adds its own beside it, so it suits almost any existing system with a healthy inverter. A DC coupled battery shares a hybrid inverter with the panels, which on an existing system means replacing the inverter, so it suits a system whose inverter is due for replacement anyway. Both qualify for the same rebates and both can be set up for backup. AC vs DC coupled batteries goes through the differences in detail.
When the existing inverter has to go
We recommend replacing the inverter, rather than working around it, when:
- It is old enough that it is likely to fail in the next few years, or it is already out of warranty
- It is faulty, throwing errors or underperforming. A solar health check will tell you
- It cannot be remotely managed, and a new inverter makes more sense than adding a gateway to it
- You want more panels as well, and the existing inverter has no room for them
- The backup you want needs a hybrid inverter or a particular battery inverter
Putting a new battery beside an inverter with two years left in it means paying for a second visit soon after. Doing both at once is often the cheaper decision over a few years, even though the quote is bigger today. We price both ways when both are sensible.
Western Power treats a battery as an upgrade
Systems installed before 1 May 2026 that are not changed stay under the old connection rules. Add a battery or another inverter and the system counts as upgraded, so the current rules apply:
- To take part in an export product such as DEBS, the system must be able to be remotely disconnected and reconnected through your retailer, which for most Perth homes is Synergy.
- If you opt out, or do not have stable internet, the system gets a fixed export limit of 1.5 kW instead.
- Inverters must comply with AS/NZS 4777.2, set to Australian Region B.
- Older inverters that cannot communicate can be covered by a gateway.
The installer lodges the connection application with Western Power, and it should be part of the quote. The same rules allow up to 30 kVA of inverter capacity on a standard connection, which matters when a second inverter is going on. Our guide to connection and export limits goes through it.
If you are on REBS
REBS is the older Synergy buyback that pays 7.135c for every unit exported, whatever the time of day. Making changes to your system can end REBS eligibility, and adding a battery is a change. You would then move to DEBS, which pays 10c a unit exported between 3pm and 9pm and 2c at other times.
With a battery that is often less of a loss than it sounds, because a stored unit used in the evening saves far more than 7.135c. It still changes the sums, so check which buyback your bill shows before you sign. See DEBS explained.
Switchboard and site checks
A battery adds circuits, protection and isolation to your switchboard, and backup adds more. Before quoting we look at:
- Whether there is physical room on the board for the new breakers and RCDs
- The condition of the board. Old ceramic fuses, or circuits with no RCD protection, usually mean an upgrade first. See ceramic fuses in old switchboards
- The main switch and the supply, especially if a second inverter is going on
- Where the battery will live, with the clearances and shade it needs
- Whether you want blackout backup, which changes the wiring. See home battery backup
Switchboard work is the most common reason a retrofit quote comes back higher than expected. Better to find it at the assessment than on install day, and where the board needs it we do the switchboard upgrade as part of the same job.
Rebates on a retrofit
The WA Residential Battery Scheme and the federal Cheaper Home Batteries Program are both worked out on the battery itself: its usable capacity, and whether it and the installer meet each scheme's conditions. Our WA battery rebate guide covers both, and what size battery you need covers sizing against your existing solar.
What to send us
A photo of your inverter's label, a photo of your switchboard with the door open, and your last power bill. From those we can usually tell you whether AC or DC coupling suits, whether the inverter should stay and what the switchboard needs, then confirm it on site. Start on our battery storage page.
FAQs
Questions on this
What is the difference between AC and DC coupled batteries?
An AC coupled battery has its own inverter and works beside your existing one. A DC coupled battery shares a hybrid inverter with the panels, which usually means replacing your inverter. See AC vs DC coupled batteries for which suits your system.
Do I need a new inverter to add a battery?
Not always. An AC coupled battery works with most existing inverters. Replacing it makes sense when it is old, faulty, cannot be remotely managed, or when you want DC coupling or a particular kind of backup.
Will adding a battery affect my REBS buyback?
It can. Making changes to your system can end REBS eligibility, and you would move to DEBS, which pays 10c a unit exported from 3pm to 9pm and 2c at other times. Check your bill to see which you are on before you sign.
Does adding a battery change my export limit?
A battery counts as an upgrade under Western Power's rules from 1 May 2026. The system needs to be remotely manageable through your retailer to take part in an export product such as DEBS. If you opt out, or have no stable internet, it gets a fixed 1.5 kW export limit.
Get a quote
Got solar and wondering about a battery?
Send a photo of your inverter label, your switchboard and your last bill. We will tell you whether your inverter stays, and whether a battery suits you yet.